top of page

MENU

OVIYA

CHETRA Pipelayers

Pipelayer TG122

The most popular pipelayer in the CHETRA line for laying pipelines in a trench, accompanying cleaning and insulation machines, for lifting and moving individual loads. Sufficient track width and large length of the track support surface in combination with an adjustable counterweight provide the machine with increased stability and high safety.

Pipelayer TG222

Lightweight pipelayer for laying oil pipelines and water communications. Can be used for working with pipes with a diameter of 400 to 600 mm. The pipelayer is used for work on normal soils and soils with reduced bearing capacity.

CHETRA TG122-3.png

01

Pipelayer TG122

CHETRA TG122-1.png

02

Pipelayer TG122

Pipelayer TG302

The medium pipelayer is used for the construction of pipelines with a diameter of 600 to 1000 mm. Sufficient track width and large machine weight allow confident operation at maximum boom extensions. The pipelayer is additionally equipped with a rear and front towing device. Special protection of the engine and radiator is provided.

CHETRA TG222-2.png

01

Pipelayer TG222

CHETRA TG222-6.png

02

Pipelayer TG222

Pipelayer TG511

A pipelayer for those who need a modern machine with maximum lifting capacity. It can be used to work with pipes with a diameter of 900 to 1420 mm. The machine is fully electronically controlled. Electrohydraulic control is used to control the lifting equipment and the movement of the pipelayer.

CHETRA TG302-3.png

01

Pipelayer TG302

CHETRA TG302-1.png

02

Pipelayer TG302

CHETRA TG511-3.png

01

Pipelayer TG511

CHETRA TG511-1.png

02

Pipelayer TG511

bottom of page